BBA were appointed by Aequus Group to provide site inspections for the finishing & snagging of for their Riverside View development.
The regeneration project has redeveloped a former office block into 95 contemporary apartments within the centre of Keynsham. A high standard of finish was demanded for the contemporary design, alongside the luxurious product specification. This would then ensure that the apartments would appeal to their target audience of modern professionals.
The brief required BBA to carry out detailed inspections with the fit-out contractor and provide snagging lists. We then monitored and managed these lists, until each apartment was ‘snag-free’ and ready for occupation.
A benchmarking meeting was conducted to agree the standard of finish for inspection. This accepted benchmark standard was then used throughout the project, to ensure understanding between all parties and consistency across the project.
Inspections were subsequently conducted bi-weekly with reports produced per room, re-inspections were conducted if necessary, leading to sign-off when all snag works were completed.
Back